<address id="xhx3n"></address>

    <meter id="xhx3n"></meter>
    <form id="xhx3n"></form>

    <menuitem id="xhx3n"></menuitem>

        <strike id="xhx3n"></strike>
        <form id="xhx3n"><progress id="xhx3n"></progress></form>

        <strike id="xhx3n"><span id="xhx3n"><p id="xhx3n"></p></span></strike>
        <form id="xhx3n"><progress id="xhx3n"></progress></form>

              print this page email this page go to the top of the page
              Home
              Contact Us
              Sitemap
              Projects Executed
              Photo Gallery
              Water Development Department
              Client:
              Water Development Department
              Architect:
              Alecos Gavrielides
              Duration: 2 years
              Commencement Date: 2006
              Completion Date: 2008
              Details

              This was a Build-Operate-Own Project and was constructed in Joint Venture between GCC Ltd. and CHAPO.  The building consists of 6,500 m2 of office space, including electromechanical installations and external works.

              The Architect of the Project was Alecos Gavrielides and the Building was handed over to the Water Development Department at the end of June 2008.

              Back to Projects Executed
              © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
              日本无卡码高清免费v_97国产在线看片免费人成视频_日韩亚洲欧美久久久www综合_免费一级aa片