• <div id="wkayg"><optgroup id="wkayg"></optgroup></div>
  • print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Projects Executed
    Elea Golf Club House
    Client:
    S.Z. Eliades Leisure Ltd.
    Architect:
    Costas Meletiou Consultants
    Duration: 12 months
    Commencement Date: May 2009
    Completion Date: May 2010
    Details
    The project consists of the construction of an in-situ reinforced concrete building, consisting of three main levels (Cart Barn Level, Lower Ground Level, Plaza Level). The project includes all the external works such as footpaths and landscaping with rocks, etc.
    Back to Projects Executed
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    农村老熟妇精品_午夜福利啪啪体验区_青青青国产最新视频在线观看_亚洲中文波霸中文字幕