• <div id="wkayg"><optgroup id="wkayg"></optgroup></div>
  • print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Projects Executed
    Photo Gallery
    American Heart Institute, Nicosia
    Client:
    American Heart Institute
    Architect:
    Pavlides & Associates
    Duration: 40 months
    Commencement Date: August 2007
    Completion Date: December 2010
    Details

    Erection of a reinforced concrete two storey building (with a basement under about one third of the building) forming the new Hospital for the American Heart Institute. An open air car park and a heliport have been constructed next to the Hospital, including a basement under about one third of the car park. The Hospital also includes an atrium of a total height of two stories consisting of a steel structure with canopy and a curtain wall. The works included the electrical and mechanical installations, and all other external works. 

     

    Back to Projects Executed
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    农村老熟妇精品_午夜福利啪啪体验区_青青青国产最新视频在线观看_亚洲中文波霸中文字幕