• <div id="wkayg"><optgroup id="wkayg"></optgroup></div>
  • print this page email this page go to the top of the page
    Home
    Contact Us
    Sitemap
    Under Construction

    Projects currently under construction by GCC

    Improvement of Pernera Avenue
    Public Works Department
    Reconstruction of existing road and pavements. The road will have two lanes, a third lane where required, paved sidewalks, bicycle lane, green lanes, parking spaces, raised pedestrian crossings and a roundabout.
    Completion Date: 19/09/2017
    Sewerage System of Temvria-Korakou communities
    Water Development Department
    Sewerage Sytems for Temvria - Korakou Villages.  The projects includes the Supply and installation of sanitary sewers, forcemains and associated works.
    Completion Date: 20/12/2017
    Paphos Archaelogical Sites
    Public Works Department
    Remodelling and unification of the Paphos Archaeological sites.  The works include the renovation of the squares, underground services, paving existing public roads and the construction of an overhead pedestrian bridge that connects the two areas.
    Completion Date: 31/07/2017
    BEDIZIA TOWER
    Bedizia Ltd

    Construction of BEDIZIA Tower in Stasinou Avenue, Nicosia, consisting of a 13-storey office building

    Completion Date: 30/11/2018
    WEATLEYCO
    WEATLEYCO LT

    Construction of 2 Luxury Villas each consisting of 2 floors, basement, roof garden, swimming pool and parking area as well as the construction of a Luxury 3-storey Apartment Building including swimming pool and parking area.  In the Parekklisia area of Limassol.

    Completion Date: 31/08/2018
    St. Raphael Hotel - Condo 12
    All-Time Tourist Complex Ltd
    Construction of 13-storey building next to the existing St. Raphael Hotel in Limassol
    Completion Date: 12/05/2019
    © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio
    农村老熟妇精品_午夜福利啪啪体验区_青青青国产最新视频在线观看_亚洲中文波霸中文字幕